← Back to projects

Hyatt Zilara & Ziva Rose Hall

Montego Bay, Jamaica

Keys
621
Type of work
Hurricane repairs + Renovation
TLDI role
Construction Manager
Years
2025–2027 Hurricane repairs2013–2014 Renovation
Status
Active

A 621-key dual-brand resort on Jamaica's north coast, the former Ritz-Carlton Rose Hall, where TLDI has worked twice: on its recovery after Hurricane Melissa and, earlier, on its renovation and expansion as Hyatt Zilara and Hyatt Ziva.

Hurricane Melissa recovery (2025–2027)

The Category 5 storm forced the resort to close in October 2025: the structure held, but the wind tore off roofs and façade panels and water entered every building.

As construction manager for the owner, Tortuga, TLDI coordinates design, contractors, procurement, budget, schedule and construction, and prepares the documentation for insurance reimbursement, with each item supported by photos, measurements and technical justification. With most materials and furniture imported, it tracks shipments through to site.

The new roofs were completed across all buildings in 2026, with reopening targeted for 2027.

Renovation and expansion (2013–2014)

Under a construction management agent contract with Playa Hotels & Resorts, TLDI oversaw architecture, engineering, permitting, construction and procurement, from the first concepts and permits in April 2013 to opening in December 2014: twenty months to renovate the existing hotel and add two new buildings.

Project highlights

Hurricane Melissa recovery (2025–2027)

  • 621 guestrooms, two lobbies and 23 food and beverage outlets: 13 restaurants, seven bars and three cafés
  • 16,000 m² of new roofs, plus façades, aluminum windows and sliding doors
  • About 8,700 m² of public areas, including restaurants, lobbies, spa and ballroom, and 3,600 m² of service areas
  • New MEP systems and equipment, from rooftop ductwork and electrical panels to air handlers, elevators and pool equipment, and recovery of pools, beach and gardens

Renovation and expansion (2013–2014)

  • Renovation of the existing hotel, 54,880 m²
  • Two new buildings adding 193 rooms (a four-level commercial building and a five-level adults-only building), for a total of 621 guestrooms
  • Three new pools, a man-made beach, new central plant and conversion of all electrical systems from 60 Hz to Jamaica's 50 Hz grid

Talk to us about a similar project